Skip to Content
Essential Preparations for the V2 Series

Essential Preparations for the V2 Series

Thank you for choosing the TORNADOSMT V2 Vision Pick-and-Place Machine!
This section will guide you through the essential preparations required before putting the machine into operation.
To ensure safe, stable, and efficient performance, please carefully follow and complete all steps in this module.
Responsible Alan
Last Update 19/12/2025
Completion Time 21 minutes
Members 22
Basic
  • Unboxing Preparation
    4Lessons · 10 mins
    • Unboxing Inspection
      10 xp
    • Reset Button
    • Emergency Stop Button
      10 xp
    • Hardware Connection
  • Install openpnp Software
    3Lessons · 11 mins
    • 下载并安装openpnp
    • 认识openpnp的配置文件夹 .openpnp2
    • 导入TORNADOSMT V2的配置文件